Video clip from the fall 2008 Open Hangar Day: Inside the Zenith Aircraft factory. Additional activities included workshops and forums, as well as a lot flying!
A real popular project at the Open Hangar Day is the "Build your own Binder" mini workshop - Attendees assemble their own three-ring binder (made specifically to hold the 11"x17" Drawings for a Zenith kit design). The parts were cut out and pilot-drilled on the CNC router, and then blind-riveted together following the simple step-by-step instructions.
You need to be a member of Zenith Aircraft Builders and Flyers to add comments!
Join Zenith Aircraft Builders and Flyers