Zenith Aircraft Builders and Flyers
Build It! Fly It! The Companion Website to the Zenair Newsletter
Greg, Thanks for the insight. I am thinking you are right; I do not want to open up a wing either. Where are you getting the tubing and fitting from? Thanks, Blaine
Replied Apr 19
Are people using the rubber gas lines firnished in the kits or using braided stainless? I know we are building experimental, but using the rubber lines seem risky when dealing with a potential (or ev…
Started this discussion. Last reply by Robert E Pickens 1 day ago.
Ed, Thanks for the update. I have looked at the AeroLED site and have not seen any mounting hardware for the 750 (no surprise). I expect Zenith will have that as a kit and I hope the pricing is reaso…
Replied Apr 14
Ed, Please let us know what you find out regarding the landing lights. I read where they can be mounted in the slat and come with a lens cover and mounting brackets. Is Zenith offering any OEM disco…
Replied Apr 10
© 2010 Created by Zenith.Aero.
Comment Wall (8 comments)
You need to be a member of Zenith Aircraft Builders and Flyers to add comments!
Join Zenith Aircraft Builders and Flyers
Regards,
Dave
I have not made an engine decision yet.
Tom Butler
Actual work on the airplane should start soon, I hope, but I have been saying that for quite a while now.
Bob
Rich
I was looking through your wing construction photos and I noticed the primer/corrosion protection. What did you use and how did you apply it?
I just finished my left wing and enjoy your photos - keep up the good work.
Thanks,
Rich (the one in Florida)
- Jimmy
The only threaded holes I had on my tanks were the sump drain and fuel outlet locations, did not have one by the gas cap. I do have the extended range tanks, but I don't understand why you would have one there. Probably should call Zenith on that one. I am using the HBH dvd's and they are a great help. I refer to both the plans, manual assembly photos, and the dvd's. You will find there is no matching grommet for the rear spar where the fuel tank line exits the root bay. They have lengthened the thick doubler which now goes past the pre-drilled hole for that line, thus making the spar thickness about 3/16". I've got a pack of grommets ordered that should work out. It's something Zenith will need to update, and Roger is aware of it.